Preparatory operations

1926.850 Demolition Preparation: citations, penalties and recently cited employers

Data as of October 5, 2026 · citations issued Oct 5, 2025 to Oct 5, 2026

Before demolition begins, a competent person must conduct an engineering survey of the structure to evaluate the condition of framing, floors, and walls and the possibility of unplanned collapse. All electric, gas, water, steam, and sewer lines must be shut off, capped, or controlled outside the building line, and hazardous materials must be identified. Workers must be protected from glass and other hazards as demolition proceeds.

26inspections cited
30alleged violation items
$4,965median initial penalty per item
$4,170median current penalty per item
37%of items contested

What the standard requires

Hazards it addresses

Cited in demolition and interior gut-renovation projects.

Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.

Citations by month

Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.

Most-cited paragraphs

ParagraphWhat it coversItemsInspectionsMedian initial penalty
1926.850(a)An engineering survey by a competent person is required before demolition begins.2020$4,965
1926.850(b)33$4,965
1926.850(c)All utility service lines must be shut off, capped, or otherwise controlled before demolition.33$15,875
1926.850(d)22$7,212
1926.850(e)11$4,965
1926.850(i)11$0

Penalties

Across 30 alleged items, OSHA and state-plan offices proposed $237,339 in initial penalties. The current total in the public data is $215,642, 9% lower after settlements, contests and amendments.

By violation type: Serious 77%; Other-than-serious 20%; Willful 3%.

Citations by state

StateInspections citedItemsInitial penaltiesCurrent penalties
New York811$50,312$45,850
Pennsylvania33$11,916$9,000
Virginia34$48,225$48,225
New Jersey22$67,585$63,140
Connecticut11$3,972$3,972
Florida11$4,341$4,341
Georgia11$3,547$3,547
Hawaii11$0$0
Illinois11$13,902$6,951
Ohio11$13,902$13,902
Oregon11$1,214$1,214
Tennessee11$4,000$4,000
Texas11$2,838$0
West Virginia11$11,585$11,500

By industry

Recently cited establishments

About these records. Citations list alleged violations and proposed penalties. Employers can contest them, and many are reduced or withdrawn in settlement. Each row shows the original and the current penalty and a status label derived from the public data as of October 5, 2026. Check the linked osha.gov page for the official record.

EstablishmentLocationIssuedAlleged itemsInitial penaltyCurrent penaltyStatus and deadlinesSource
JV Fast Construction LLC Brooklyn, NY Aug 18, 2026 1 $4,965 $2,482 Informal settlementAbatement due Aug 26, 2026 osha.gov
Billy Gray Contracting, Inc. Sandy Springs, GA Aug 17, 2026 1 $3,547 $3,547 Final order osha.gov
Colony Services Corp. New York, NY Aug 12, 2026 1 $11,585 $11,585 Final order osha.gov
D&D Wood Sales, Inc. Roaring Spring, PA Aug 7, 2026 1 $0 $0 Final orderAbatement due Sep 2, 2026 osha.gov
Supreme Junk Removal LLC Brooklyn, NY Jul 31, 2026 1 $4,965 $4,000 Informal settlementAbatement due Aug 12, 2026 osha.gov
Tajiri Demolition & Disposal LLC Kaneohe, HI Jul 17, 2026 1 $0 $0 Final order osha.gov
FMJ Construction LLC Tualatin, OR Jun 17, 2026 1 $1,214 $1,214 Final order osha.gov
Steuben County Community Services Bath, NY May 28, 2026 1 $0 $0 Final orderAbatement due Jun 4, 2026 osha.gov
Hexagon Industries Inc. Bronx, NY May 7, 2026 1 $3,972 $3,972 Final order osha.gov
Merlo, Inc. Wheeling, WV May 1, 2026 1 $11,585 $11,500 Informal settlementAbatement due Jun 4, 2026 osha.gov
BCB Homes Inc. Naples, FL Apr 30, 2026 1 $4,341 $4,341 ContestedAbatement due May 27, 2026Contested May 27, 2026 osha.gov
Township of Toms River Department of Public Works Toms River, NJ Apr 27, 2026 1 $56,000 $56,000 ContestedAbatement due May 18, 2026Contested May 12, 2026 osha.gov
Repurposeful, LLC Hoosick Falls, NY Mar 18, 2026 4 $14,895 $14,895 ContestedAbatement due Mar 24, 2026Contested Apr 17, 2026 osha.gov
Cen-Tex Remodeling, Inc. Burnet, TX Mar 11, 2026 1 $2,838 $0 Informal settlementAbatement due Apr 6, 2026 osha.gov
Mka General Construction Inc. Brooklyn, NY Feb 10, 2026 1 $4,965 $4,965 Final orderAbatement due Feb 18, 2026 osha.gov
Ronald F. Richter, LLC Ridgefield, CT Aug 20, 2026 1 $3,972 $3,972 Informal settlementAbatement due Sep 4, 2026 osha.gov
Paul's Machine & Welding Corp. Normal, IL Jan 9, 2026 1 $13,902 $6,951 Informal settlementAbatement due Feb 10, 2026 osha.gov
Smart Construction LLC Arlington, VA Dec 23, 2025 1 $15,875 $15,875 ContestedAbatement due Jan 21, 2026Contested Feb 24, 2026 osha.gov
James G Davis Construction Corporation Arlington, VA Dec 23, 2025 2 $31,750 $31,750 ContestedAbatement due Jan 21, 2026Contested Jan 20, 2026 osha.gov
Empire Group of Reading PA, Inc. Shillington, PA Dec 12, 2025 1 $6,620 $5,000 Informal settlementAbatement due Jan 9, 2026 osha.gov
Gordon H. Baver, Inc. Shillington, PA Dec 12, 2025 1 $5,296 $4,000 Informal settlementAbatement due Jan 9, 2026 osha.gov
Lucio & Diaz Corp. Brooklyn, NY Dec 1, 2025 1 $4,965 $3,950 Informal settlementAbatement due Dec 8, 2025 osha.gov
Klosterman Vested Interests, LLC Saint Marys, OH Nov 13, 2025 1 $13,902 $13,902 ContestedContested Dec 10, 2025 osha.gov
Bscnj Services Corp. Carteret, NJ Nov 4, 2025 1 $11,585 $7,140 Formal settlementAbatement due Dec 2, 2025Contested Dec 4, 2025 osha.gov
Name withheld (individual) Lynchburg, VA Feb 9, 2026 1 $600 $600 Final orderAbatement due Nov 5, 2025 osha.gov
Onsite Emergency Services, LLC Chattanooga, TN Oct 24, 2025 1 $4,000 $4,000 Final orderAbatement due Aug 11, 2025 osha.gov
The 26 most recent inspections citing 1926.850. Penalties shown are for the items under this standard only.

Often cited together

Questions

What does OSHA standard 1926.850 require?

Before demolition begins, a competent person must conduct an engineering survey of the structure to evaluate the condition of framing, floors, and walls and the possibility of unplanned collapse. All electric, gas, water, steam, and sewer lines must be shut off, capped, or controlled outside the building line, and hazardous materials must be identified. Workers must be protected from glass and other hazards as demolition proceeds.

How often was 1926.850 cited in the last 12 months?

In the public data as of October 5, 2026, 1926.850 (Demolition Preparation) appeared in 26 inspections with citations issued between Oct 5, 2025 and Oct 5, 2026, covering 30 alleged violation items.

Which part of 1926.850 is cited most?

1926.850(a) was the most-cited paragraph, with 20 items: An engineering survey by a competent person is required before demolition begins.

Which states cite 1926.850 most often?

The most citations under 1926.850 in this period were issued in New York, Pennsylvania, Virginia.

What is the typical penalty for a 1926.850 violation?

The median initial (proposed) penalty per item was $4,965; the median current penalty after settlements and amendments was $4,170. Totals: $237,339 proposed, $215,642 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.

Are 1926.850 citations final?

Not necessarily. A citation is an allegation until it becomes a final order. 37% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.